Project Meeting: 15th September 1998

At: 9:30am, MVB 3.35

Present: Ed, Mike, James, Jim, Henk

Progress

Problems with FootBridge (postponed), audio recording quality on the CyberJacket and some system integration teething problems have prevented us from reaching our system integration demo objectives. The FootBridge delay is the most difficult to address, we will just have to live with it. The system integration problems (bug fixing) needs to tackled by the students. Henk and Jim can take the lead  improving audio capture quality.

Mike.

Ed. Working on note and domain servers alongside Mike. There are a list of bugs to work on at present.

James. Fighting with sockets and a 'downloading' dialogue box.

Alistair. Tried to solve the audio recording problem. Finalised the audio software and render manager.

Phil. FootBridge needs more work to improve the transmitter signal modulation (shaping). Unfortunately Phil is tied up with other deadlines, so the best we can hope for is a simplex link by end Wednesday (even this didnt happen in the end). Final FootBridge integration is likely to be delayed until after September 28th.

By Next Week: